Lots of progress, not a lot of blog updates. Third floor addition has a roof, is wrapped and plumbing and electric rough-ins are complete.
The front side of the 3rd floor addition, wrapped and ready for the windows.Front Deck with sealed roof, looking north to Center CityElectric Panel and LAN/Coax Rough-In
PEX Water Supply Piping
Kitchen High Cabinet Wall – Wall Over, Refrigerator & Freezer, Pantry CabinetKitchen Low Cabinet Wall – Rangetop and Vent HoodKitchen Island – 11′ longMaster Bathroom – Double Vanity & Medicine Cabinet Rough-InMaster Bathroom – Double Steam Shower