Lots of progress, not a lot of blog updates. Third floor addition has a roof, is wrapped and plumbing and electric rough-ins are complete.

 

The front side of the 3rd floor addition, wrapped and ready for the windows.
Front Deck with sealed roof, looking north to Center City
Electric Panel  and LAN/Coax Rough-In

 

PEX Water Supply Piping

Kitchen High Cabinet Wall – Wall Over, Refrigerator & Freezer, Pantry Cabinet
Kitchen Low Cabinet Wall – Rangetop and Vent Hood
Kitchen Island – 11′ long
Master Bathroom – Double Vanity & Medicine Cabinet Rough-In
Master Bathroom – Double Steam Shower

 

 