Progress Update #4: The New Third Floor

Now that the roof has been torn off and replaced, the process of framing up a new Master Suite on the third floor begins.

New stairs going up from the Living Floor to the Master Suite
From the Living Room looking towards Atrium Staircase
Looking up – walls of third floor in the process of going up
Top of the Third Floor landing – a “public” hallway towards the Master Suite, Outdoor Deck to the left, Atrium Staircase to the right
Master Bedroom through a public and private hallway
Master Bedroom and Master Bathroom
Downtown Center City Philadelphia from the Master Bedroom window
Looking down the Atrium Staircase
From the bedroom looking to Atrium Staircase opening. Top of this area will have skylights to let light down into the house.
Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s